Under section 10, appointed surveyors settle matters connected with qualifying works that are in dispute between the owners. An award may determine the right to execute works, the time and manner of carrying them out, and other incidental matters including costs. It is not required for every construction project or every notice.
Updated 6 October 2026. General guidance for owners in England and Wales.
What the document can cover
The award identifies the relevant works and may set out methods, access, timing, protective measures and arrangements for damage. Drawings and a condition record commonly help make the scope clear. The surveyors consider what is appropriate to the notified works; a generic document should not substitute for reviewing the actual project.
Check before work begins
Before starting the relevant works, check that the statutory notice period has expired or an earlier start has been agreed, and comply with the award and other required permissions. A party wall award does not replace planning permission, building-control approval, lease obligations or other required consents. Section 1 new-wall notices have a different response route from party structure and excavation notices.
Changes, damage and appeals
If the drawings or construction method change, ask the surveyors to assess whether a further notice or award is needed. Report suspected damage promptly and retain photographs and records. Either owner may appeal to the county court within fourteen days beginning with service of the award on them. Seek immediate legal advice if considering an appeal; an appeal does not automatically stay the works.
Common questions
Can an award stop all building work?
An award determines relevant disputed matters under the Act. It does not create a general right to prevent lawful development or replace other permissions.
Can works start as soon as the award arrives?
Before starting the relevant works, check that the statutory notice period has expired or an earlier start has been agreed, and comply with the award and other required permissions.
Does an award have a universal expiry date?
The award relates to the works it describes, and the underlying notice validity and project changes matter. Have the notices and award checked if work is delayed or altered.
Discuss your notice or proposed works
Send the notice and drawings so we can explain the next step and our fee arrangements.
Primary sources
- Party Wall etc. Act 1996, section 1: New walls at the line of junction
- Party Wall etc. Act 1996, section 5: Disputes following party structure notices
- Party Wall etc. Act 1996, section 6: Adjacent excavation
- Party Wall etc. Act 1996, section 7: Compensation and safeguards
- Party Wall etc. Act 1996, section 10: Surveyors, awards and reasonable costs
- Party Wall etc. Act 1996, section 11: Expenses of the works