Skip to main content
Established 202210+ Years' ExperienceFully InsuredFree ConsultationReplies within 2 Working Hours
Why This Matters

Get the process right from the start

Carrying out building works without following the correct party wall process can delay your project, lead to neighbour disputes, and in some cases result in an injunction stopping the works entirely. We help building owners get the process right from the start.

A party wall notice is not optional. It is a legal requirement under the Party Wall etc. Act 1996, and failure to serve one before starting notifiable works is a breach of the Act. The sooner you appoint a surveyor, the sooner the process can begin - and the less likely you are to face delays once work is ready to start on site.

Qualifying Works

Works that require a party wall notice

Works on or near a shared (party) wall
Loft conversions affecting the party wall
Rear extensions built against a party wall
Raising or underpinning a party wall
Removal of chimney breasts from a party wall
Excavation within 3 metres and below the neighbouring foundations
New wall built at the line of junction (the boundary line)
Excavation within 6 metres meeting the statutory downward 45-degree plane towards the excavation

If you are unsure whether your works qualify, call us and we will advise you at no charge.

Getting started

What we need from you

Simply send us your drawings and we'll assess:

Email us your drawings →
  1. Whether your works are notifiable under the Party Wall etc. Act 1996
  2. If so, under which sections and subsections of the Act
  3. Which of your neighbours need to be served upon.
Our Process

How we work with building owners

1

Review your plans

We review your architect's plans or proposed works and identify which elements require a party wall notice and under which section of the Act.

2

Prepare and serve the notices

We prepare the correct notices and serve them on all neighbouring owners whose properties are affected. We handle all paperwork and ensure notices are served in the right format and at the right time.

3

Liaise with neighbours and their surveyors

We communicate directly with your neighbours and, where they appoint their own surveyor, liaise with them professionally to keep the process moving.

4

Produce the party wall award

Where a dispute requires an award, we prepare the document recording the relevant rights, conditions and arrangements for the notified works. Before starting the relevant works, check that the statutory notice period has expired or an earlier start has been agreed, and comply with the award and other required permissions.

Neighbour Objections

What if my neighbour objects?

If your neighbour dissents to the notice, they can appoint their own surveyor, or agree to use an agreed surveyor appointed by both of you together. Either way, the process continues. A dissent does not stop your works: it simply means surveyors must be appointed to prepare a party wall award before work begins. If your neighbour does not reply at all, we serve a further 10-day request (section 10(4)) before a surveyor can be appointed on their behalf. You'll know exactly where each neighbour stands, so you can plan your start date with confidence.

We manage this process regularly and will keep your project on track. In most straightforward cases, a dissent adds a few weeks to the timeline rather than causing significant delay.

Ready to appoint a building owner's surveyor?

We will review your plans, advise on what is required, and get the process started.

Free, no obligation

Get your free quote

Tell us a little about your project and we will come back with a clear quote. We reply within 2 working hours.

I am

We use your details only to answer this enquiry. Privacy policy