Skip to main content
Established 202210+ Years' ExperienceFully InsuredFree ConsultationReplies within 2 Working Hours

Roof works, side returns and foundation depth

Party wall surveyor in Ealing

For a loft conversion, side-return extension or new foundations in Ealing, we start with the actual drawings. They show whether the shared wall, boundary or neighbouring foundations bring the work within the Act.

A loft conversion is not a notice category by itself

A project described as a loft conversion may involve beam bearings in a party wall or other work to a party structure. Alternatively, some elements may not engage the Act. Identify the structural work before selecting a notice; the project name alone is not enough.

For a side extension, measure depth as well as distance

Excavation near a neighbouring structure can need notice even where the house is detached. The section 6 tests depend on excavation depth relative to the neighbouring foundations, including the statutory 45-degree-plane test for the six-metre category. Provide the foundation sections and adjoining positions; distance on its own is not the complete test.

Check conservation controls independently

Ealing's planning and conservation requirements may affect the design or permissions for the property. Those controls do not replace the Party Wall Act procedure or change its notice periods. If the approved design changes, have the notified scope checked again before starting.

Reference: Ealing planning and conservation guidance.

Questions about party wall work in Ealing

Do all Ealing loft conversions need a party wall notice?

No. The proposed work to a party wall or another party structure determines the answer. Send the structural drawings for assessment.

Do new foundations near a neighbour always need notice?

Distance alone is not enough. The section 6 tests also depend on depth relative to the neighbouring foundations.

Does a conservation area change the Act's notice periods?

The Act is separate from conservation-area planning controls. A project may need to satisfy both processes.

Who normally pays the surveyor's fees?

The building owner normally pays reasonable surveyor costs. Under section 10(13), the surveyors determine who pays reasonable costs arising from the dispute. Check the written appointment terms as well as any award; we explain our invoicing arrangements before instruction.

Legal reference: Party Wall etc. Act 1996. The requirements depend on the work, notice and property interests.

Tell us what is planned

Send the relevant drawings or the notice you have received. We will explain the next step for your property in Ealing.

Get Free Assessment

Free, no obligation

Get your free quote

Tell us a little about your project and we will come back with a clear quote. We reply within 2 working hours.

I am

We use your details only to answer this enquiry. Privacy policy